Oxfordshire Cleanrooms

Location: Oxfordshire

Converting existing Dry Rooms to Cleanrooms

SMD is a specialist construction company with a Mechanical and Electrical department capable of undertaking specialist works associated with the design and construction of high-quality controlled environments.

Client

Undisclosed (NDA)

Completed

Approximate Value

£410K

Sector

Research and Development

Project Overview

This particular project involved designing and delivering all aspects for the conversion of four existing Dry Rooms into variable humidity controlled ISO 7 classified cleanrooms. Through the integration of cloud point surveys and 3D modelling, the project achieved a high level of coordination accuracy.

Upon completion and validation, the cleanrooms met the most stringent standards for cleanliness and environmental control, generally as detailed below:

  • Setpoint of 21°C was maintained with a tolerance of +/- 2°C.
  • The humidity set point (Variable based on process) was maintained within a tolerance of +/- 5%.

Challenge

The project’s successful completion within the 12-week timeline required efficient project management, close collaboration among various teams, and proactive issue resolution. Working in conjunction with the client end users facilitated a clear sequence of works, completion, and handover for early occupation.

Key Features

  • Facility – Humidity (Variable) controlled laboratories

  • Floor Area – 360m2

  • 24 Week design, install, commission and validation